Unpack your rubber roof kit and allow the membrane to rest over your prepared roof deck for 30 minutes. Fold back the membrane to expose the part of the roof you are working on and apply roofing adhesive with a roller or spray to both deck and membrane. Roll the membrane back and use a roller to remove any bubbles.